Projects
Crestview Crossing
Newberg, Oregon
33 acre lot for 140 single family homes, 2 apartment complexes for JT Smith Co & commercial site for Todd Construction. Scope of work included, clearing & grubbing, demolition of existing structures, abandonment of well & septic systems, erosion control, earthwork, underground utilities, aggregate bases, flatwork, paving, site lighting, fencing, site furnishings, VC mitigation & landscaping. D&T was able to work with the project team to reduce schedule duration, budget & wet weather risk for the owner by utilizing cement modified street subgrades.
HWY 99 ODOT frontage improvements, including signal & intersection improvements
Widening, underground utilities with sanitary sewer up to 20ft depth & bore under HWY 99
Storm water chamber detention systems
Storm Filter manholes & catch basins up to 96” diameter
32 Acres of Clearing & Grubbing
115,000 CY of Excavation & Embankment
64,000 TN of Aggregate import
10,000 lf sanitary sewer
14,000 lf storm drain up to 42” diameter
4ea storm WQ facilities totaling 85,000 sf
12,000 lf domestic & reclaimed water systems
10,000 lf dry utilities
Darby Ridge
Tigard, Oregon
5-acre lot for 34 housing units for Pulte Group. Previously a single residence dwelling and orchard. The scope of work includes cleanup of contaminated soils, clearing and grubbing, demolition of single-family residence, abandonment of well and septic systems. D&T is tasked with installing over 6,000 linear feet of pipe with depths up to 20 feet in addition to WACO frontage improvements.
12,000 cy site excavation & embankment
12,000 cy imported embankment
8,000 sf terraced retaining walls
2,000 lf sanitary main
2,600 lf storm main
940 lf water main
Davis Estates Subdivision Ph 1
Forest Grove, Oregon
10-acre lot for 80+ homes for Chad E Davis Construction. Previously a single resident dwelling with an onsite shop which later than demolished to make way for 80+ homes.
5,000 lf sewer line
3,000 lf storm line
2,000 lf water line
82 lots of dry utilities
20,000 cy soil embankment
22,000 tons aggregate import
9,000 sf cement treatment
6,000 ultra-block retaining wall
Pacific Ridge Apartments
Tigard, Oregon
3-acre lot for multifamily housing for JT Smith Companies. Previously a heavily forested vacant lot. The scope of work included clearing and grubbing, stepped and staged footing excavation, export of soils, cement modified subgrades, concrete flatwork, over 5,000 linear feet of pipe, CMP and Chamber Maxx detention systems, meter vaults and building fire risers and dry utilities.
18,000 cy excavation
2,000 cy stepped & staged footing excavating
6,000 cy embankment
18,000 cy export soil
3,500 sf retaining wall
900 lf sanitary main
1,200 lf water main
3,500 lf storm main
96” CMP detention system
River Terrace
Town Center
Tigard/Sherwood, Oregon
30-acre lot for 150+ housing units for The New Home Company. The project was presented with contaminated soil as this lot was previously a farm. Contaminated soil is often hard to treat and dispose of, which a project like this, contractors tend avoid, but D&T was up for the challenge and succeeded.
120,000 cy soil embankment
70,000 cy soil import
70,000 tons aggregate import
8,000 lf storm line
10,000 lf water line
30,000 lf dry utilities
17,000 sf allan-block retaining wall
Sunset Village Ph2:
Gresham, Oregon
18-acre lot for 150+ homes by Taylor Morrison. The lot previously called Sunset Nursery, consisted of clean-up of nursery pots and dirt totaling over 15,000 cubic yards of screened dirt, which was fully operated by remote control.
10,000 lf storm main
8,000 lf sewer main
5,000 lf water line
15,000 sq yd cement treatment
40,000 cy soil embankment
40,000 ton aggregate import
Dartmouth Apartments (Since renamed “The Overland”):
Tigard, Oregon
A two building podium style multi-use project with first floor retail and parking garage, second floor parking and 219 apartment units, built with Essex General Construction for SKB. The project had complex foundation excavation and shoring as well as significant street improvements.
12,500 cy site excavation & embankment
2,200 LF storm and subsurface drainage
1,500 LF of street widening and reconstruction
Extensive traffic control
Sanitary realignment and connection
Sellwood Bridgehead Apartments
Portland, Oregon
Construction of a single 5 story building featuring 119 apartment units with below grade parking & shoring for Essex General Construction. Scope includes demolition of existing warehouse structure, erosion control, mass excavation, cleanup of contaminated soils, shoring support, underground utilities, aggregate bases & finish grading. D&T was able to work with the project team to limit haul, reducing both schedule duration & budget by incorporating a combination of layback & shoring to safely complete the mass excavation for the project.
Demolition of 17,200 sf building including salvage.
PBOT frontage improvements on 3 side of the project.
14,000 cy of mass excavation haul off, contaminated soil haul off, footing excavation & backfill in conjunction with 8,000 sf of soldier pile & lagging shoring installation.
Sanitary sewer service.
Storm system including basement dry wells & water quality facilities.